Operating Room Efficiency

Operating Room Efficiency, Measured in Real Time

Operating rooms are the highest-cost, highest-revenue site of service in the hospital. But the tools most teams rely on tell you what happened only after the day is over. Your EMR charts each interval; it does not measure that interval against what it should have taken, in real time, while there is still time to act.

Photograph: an operating room mid-case, the sort of room whose minutes this page prices
Every minute in the room has a number attached to it.

You can’t manage what you can’t measure

Your operating rooms are the most expensive service in the hospital, at about $47 a minute per room. Most teams still manage them with no live view of where the minutes go. Synchrony Surgical allows you to define operating room expectations, track every case in real time, and turn the minutes you save into dollars.

$47

per minute, per room: the published industry cost of running an operating room. Small inefficiencies compound fast.

210

surgical metrics to manage in a single day across 6 rooms running 6 cases each. Tracking that by hand, in real time, is not possible.

0

real-time visibility into which room is behind, who is accountable, and where the minutes went. That is the reality in most ORs today.

Efficiency starts with an expectation for every interval

Every interval in a case has an expected duration your facility sets, and one surgical role that owns it. Synchrony measures each case against those numbers while it runs, so time saved or lost lands with the person responsible, in the room, today.

  1. In Room

    Owned by
    Circulating nurse
    Expectation
    Scheduled start
    What it covers

    For the first case, the scheduled start time. For every case after, the turnaround expectation: the previous case's out-of-room time plus the expected cleanup.

  2. Anesthesia Ready

    Owned by
    Anesthesiologist
    Expectation
    15min
    What it covers

    From the patient entering the room to anesthesia ready.

  3. Cut

    Owned by
    Surgeon
    Expectation
    15min
    What it covers

    From anesthesia ready to first incision.

  4. Closed

    Owned by
    Surgeon
    Expectation
    Collected
    What it covers

    Not measured against an expectation. Recorded so the next interval has a start.

  5. Out of Room

    Owned by
    Anesthesiologist
    Expectation
    5min
    What it covers

    From closed to the patient leaving the room.

The minutes above are examples. Expectations are yours to set, by department and by case type, and to revise when the data shows one was wrong. The standard belongs to the hospital, not to an algorithm.

See how Synchrony measures every interval

Not another retrospective report

Real-time, not after the fact

An EMR records what happened. Synchrony measures each interval against its expectation as the case runs, so a delay is something you can still act on today.

Accountability by role

Every interval is assigned to a specific surgical role. Minutes saved or lost are attributed to the person responsible, not just to the room. The attribution works in both directions, so no one is blamed for a delay that wasn’t theirs.

Turnaround, tracked

Most systems don’t measure the time between cases. Synchrony does, and it is often the single metric that shows where a full day’s capacity is quietly lost. See turnaround time tracking in detail.

What your EMR does, and what it does not

Most surgical teams already record case times, and conclude from that they have what Synchrony provides. Recording a time and running an efficient room are two different jobs. The expectation agreed before the case, the live display that changes what happens during it, and the analysis that raises the standard afterwards all sit around the data point, and that is where the minutes are.

Operating room efficiency capabilities, compared between Synchrony Surgical and a hospital EMR.
CapabilitySynchronyYour EMR
Communication of expectationsProvidedNot provided
Pre-op readinessProvidedNot provided
Anesthesia on-time sign-inProvidedNot provided
Surgeon on-time sign-inProvidedNot provided
First case in roomProvidedProvided
In Room to Anesthesia ReadyProvidedNot provided
Anesthesia Ready to CutProvidedNot provided
Cut to CloseProvidedProvided
Close to Out of RoomProvidedProvided
Turnaround time recordedProvidedProvided
Turnaround surfaced as a live metricProvidedNot provided
Reasons for delayProvidedNot provided
Real-time display driving performanceProvidedNot provided
Automated and customizable analyticsProvidedNot provided
Data visible without a manual exportProvidedNot provided

Your EMR covers four of the fifteen. All four are timestamps it writes down after the fact, which is enough for a report and too late for the room.

Proof

Proof the method works

Defining and measuring interval expectations cut turnover from 47 to 20 minutes at the Spine & Joint Institute at Redlands Community Hospital.

They began manually, starting from a co-management agreement in 2012: a champion, a stopwatch, and a shared standard. As surgeons moved cases to the site that respected their time, case volume tripled over four years. Synchrony has greatly enhanced this process digitally.

Read the Case Study

47 → 20

min turnover

3×

case volume, four years

2012

co-management agreement

2024

digitized with Synchrony

The rest of the surgical day

Time is lost in three places, and they compound: a late first case pushes every case behind it, and slow turnarounds push them again.

First Case On-Time Start

Pre-Op, anesthesia, and surgeon readiness

Turnaround Time

Patient out to next patient in

See your OR minutes in dollars

Start with a 60-Day Assessment and watch the minutes add up, or measure continuously from day one. Request a demo and we’ll show you all three steps running on your own workflow.

Request a Demo